Process Management during Construction of Digital I&C System in Tianwan Nuclear Power Plant
-
摘要: 田湾核电站一期工程(1、2号机组)采用了全数字化的仪表控制系统(DCS)。本文结合田湾核电站一期仪表控制项目的 DCS在合同谈判和后续执行过程中取得的经验及系统运行过程中的实践,阐述了DCS在田湾核电站二期(3、4号机组)仪表控制项目建设过程中的应用。Abstract: The full digital I&C system was used in Tianwan Nuclear Power Station Phase I(Unit 1&2).This paper describes the reflection and implementation of the experiences learned from the contractual negotiation and execution in Phase I,and the practice and optimization obtained during the system operation in the construction of Tianwan Nuclear Power Station Phase II(Unit 3&4) for I&C System.
-
Key words:
- Nuclear power station /
- Distribution control system /
- I&C system /
- Experience feedback
-