Abstract:
Considering the safety features of different types of reactors,different methods of dividing plume emergency planning zone(PEPZ) were compared and analyzed,and then systematically classified ac-cording to the reactor types.The applicable methods of dividing PEPZ for different reactor types were pro-posed.Finally,the methods were preliminary applied taking the High-Temperature gas-cooled Reactor-Pebble bed Module(HTR-PM) as an example.The preliminary study results show that,the site boundary of HTR-PM meet the criteria of dividing PEPZ,and compared with the large light water reactors,its PEPZ can be signifi-cantly decreased.