Passive Hydrogen System Used at Chashma Nuclear Power Plant Phase Ⅱ Project
-
摘要: 简要介绍严重事故工况下非能动氢气复合装置在恰希玛核电站二期工程(C-2)中的应用。结合系统设计说明和设备制造就其工作原理、设计原理、现场布置及依据等方面进行了阐述。同时对系统的安全分析、运行维护等方面进行了介绍。Abstract: This paper briefly introduces the usage of passive hydrogen recombiner equipment at severe accident status in Chashma Nuclear Power Plant PhaseⅡ.It is combined with system design description and equipment fabrication to describe its items of work principle,design principle,site layout and reference and so on.In the meantime,system safety analysis as well as operation and maintenance have been introduced.
-