Experience Feedback from Commissioning of AP1000 Project Nuclear Island Polar Crane
-
摘要: 介绍浙江三门、山东海阳核电项目核岛环吊试验各阶段的工作内容、试验方法及试验过程中出现的问题及解决方法,提出先进非能动型压水堆核电技术(AP1000)项目环吊国产化改进建议,为后续AP1000项目核岛环吊的国产化及调试提供借鉴。Abstract: The paper introduces the work content,test method and the problems with the solutions of the nuclear island polar crane during the test in Zhejiang Sanmen and Shandong Haiyang nuclear projects,then make a summary of the advice on the improvement of the domestic manufacture of the advanced passive pressurized water reactor(AP1000) polar crane.It can be a reference for the domestic manufacture and commissioning of the future AP1000 project polar cranes.
-
Key words:
- AP1000 /
- Nuclear island commissioning /
- Experience feedback
-
计量
- 文章访问数: 14
- HTML全文浏览量: 5
- PDF下载量: 0
- 被引次数: 0