Design and Development of Multi-unit Simulator Management System in Tianwan Nuclear Power Station
-
摘要: 田湾核电站全范围模拟机主要用于机组主控室运行人员的培训与授权,是主控室操纵员培训的重要工具和手段,需要最大限度地保证与机组的一致性和可用率。为了使田湾核电站模拟机管理系统符合国家能源行业标准,同时能够实现模拟机的电子化全方位管理,中国核动力研究设计院设计和开发了多机组模拟机管理系统。该系统保证了模拟机的维护和管理符合行业标准,提高了核电厂模拟机管理水平。目前,该系统已成功应用于田湾核电站1/2号机组模拟机管理,并可在将来直接应用于3/4号、5/6号机组模拟机。同时,该系统可通过少量定制开发的方式向其他在役及新建核电机组供货。Abstract: The full-range simulator in Tianwan nuclear power plant is mainly used for the training and authorization of the operators in the master control room. Since it is an important tool and means for operator training, its consistency with the main unit and its availability shall be guaranteed. In order to that the simulator management system meets the requirement of the standards in the national energy industry, and the requirement of digitalized comprehensive maintenance and management, Nuclear Power Institute of China designed and integrated the multi-unit simulator management system. The system ensures that the simulator’s maintenance and management satisfies the industrial standards, and the system enhances the simulator management in nuclear power station. Currently, the system has been successfully applied in the simulators in units 1/2 of Tianwan Nuclear Power Station. It can be applied directly in the simulators in units 3/4 and units 5/6 in the future. At the same time, the system can applied to other NPPs in service and to be built by a small amount of customized development.
-
Key words:
- Nuclear power station /
- Simulator /
- Management system
-
计量
- 文章访问数: 11
- HTML全文浏览量: 4
- PDF下载量: 0
- 被引次数: 0