The discussion on control room envelope integrity, source term analysis in habitability assessments and other impact factors for dose consequence is provided combined with regulatory requirements and the current status of domestic NPPs. Considering that the infiltration is an important factor for control room habitability assessment, CRE integrity test should be performed to demonstrate the CRE’s infiltration characteristics. The consequence assessment should be performed based on different DBAs and different pathways, such as pathways internal to the plant.