Advance Search
Volume 35 Issue 4
Feb.  2025
Turn off MathJax
Article Contents
Zhang Wenfeng, Duan Yongqiang, ZeNG Chang. Nuclear Power Commissioning Problem Treatment and Design Analysis[J]. Nuclear Power Engineering, 2014, 35(4): 94-97. doi: 10.13832/j.jnpe.2014.04.0094
Citation: Zhang Wenfeng, Duan Yongqiang, ZeNG Chang. Nuclear Power Commissioning Problem Treatment and Design Analysis[J]. Nuclear Power Engineering, 2014, 35(4): 94-97. doi: 10.13832/j.jnpe.2014.04.0094

Nuclear Power Commissioning Problem Treatment and Design Analysis

doi: 10.13832/j.jnpe.2014.04.0094
  • Received Date: 2013-05-28
  • Rev Recd Date: 2014-03-27
  • Available Online: 2025-02-15
  • During nuclear power plant construction, commissioning is a very important stage. Through commissioning it finds the problems of the whole system, verifies the correction of design, equipments, and the installation, so to guarantee plant work as the performance requirements. This article states the commissioning purples, commissioning program management, commissioning results analysis and treatment. Using the NSSS ASG commissioning as example, it states the main content of commissioning and utilizes the flowmaster software handling the problem of deaerator flowrate excessing base requirement. That deals with the problem quickly and fast.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (25) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return