SUN Mingchen, WU Shengguo. Analysis of LCA/LCB DC Power Supply Loss in Fuqing Nuclear Power Plant[J]. Nuclear Power Engineering, 2015, 36(1): 94-97. doi: 10.13832/j.jnpe.2015.01.0094
Citation: SUN Mingchen, WU Shengguo. Analysis of LCA/LCB DC Power Supply Loss in Fuqing Nuclear Power Plant[J]. Nuclear Power Engineering, 2015, 36(1): 94-97. doi: 10.13832/j.jnpe.2015.01.0094

Analysis of LCA/LCB DC Power Supply Loss in Fuqing Nuclear Power Plant

doi: 10.13832/j.jnpe.2015.01.0094
  • Received Date: 2014-01-09
  • Rev Recd Date: 2014-09-09
  • Available Online: 2025-02-15
  • This paper comprehensively analyzes the impact on the nuclear power plant security when LCA / LCB loses the power. When LCA loses the power, the normal boronization of the reactor coolant is unavailable, only the direct boronization can be used; the normal discharge, excess discharge and low pressure discharge of the pressurizer are unavailable; the reactor trip breakers disconnect and P4 signal appears; the reactor trips or safety injection probably happens for the excessive cooling reactor coolant or too low pressure. When LCB loses the power, normal boronization is available, and normal discharge can be used by manual operation, and the reactor shutdown or safety injection probably also happen for the same reason.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (23) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return