GUO Peibin. Study on Extension of Calibration Cycle for Radiation Monitoring Instrument in Tianwan Nuclear Power Plant[J]. Nuclear Power Engineering, 2015, 36(1): 113-115. doi: 10.13832/j.jnpe.2015.01.0113
Citation: GUO Peibin. Study on Extension of Calibration Cycle for Radiation Monitoring Instrument in Tianwan Nuclear Power Plant[J]. Nuclear Power Engineering, 2015, 36(1): 113-115. doi: 10.13832/j.jnpe.2015.01.0113

Study on Extension of Calibration Cycle for Radiation Monitoring Instrument in Tianwan Nuclear Power Plant

doi: 10.13832/j.jnpe.2015.01.0113
  • Received Date: 2013-11-19
  • Rev Recd Date: 2014-02-24
  • Available Online: 2025-02-15
  • Based on the collection and statistical analysis of the radiation monitoring instrument calibration data, and taking the typical GIM204 gamma dose rate monitoring device as an example, the feasibility is demonstrated by the experience feedback method, to adapt to the implementation of the refueling scheme for a long period of time in Tianwan nuclear power station. Studies have shown that when the calibration cycle of GIM204 is extended from1 year to 1.5 year, the relative calibration error does not exceed the allowable values, and satisfies the requirement on refueling cycle extension.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (21) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return