DUAN Hongwei, LI Juan, WANG Jing, ZHANG Hui, WANG Yanqi, TIAN Feng. Discussion of Management Review in Nuclear Power Plants[J]. Nuclear Power Engineering, 2015, 36(1): 182-184. doi: 10.13832/j.jnpe.2015.01.0182
Citation:
DUAN Hongwei, LI Juan, WANG Jing, ZHANG Hui, WANG Yanqi, TIAN Feng. Discussion of Management Review in Nuclear Power Plants[J]. Nuclear Power Engineering, 2015, 36(1): 182-184. doi: 10.13832/j.jnpe.2015.01.0182
DUAN Hongwei, LI Juan, WANG Jing, ZHANG Hui, WANG Yanqi, TIAN Feng. Discussion of Management Review in Nuclear Power Plants[J]. Nuclear Power Engineering, 2015, 36(1): 182-184. doi: 10.13832/j.jnpe.2015.01.0182
Citation:
DUAN Hongwei, LI Juan, WANG Jing, ZHANG Hui, WANG Yanqi, TIAN Feng. Discussion of Management Review in Nuclear Power Plants[J]. Nuclear Power Engineering, 2015, 36(1): 182-184. doi: 10.13832/j.jnpe.2015.01.0182
According to the nuclear safety regulations and guidelines in China, the information of the IAEA and the NRC, this paper discusses the origin, purpose, method and report of the management review, the basic concepts and requirements. In order to identify the difference between the management review and the internal quality assurance audit, the paper also compares their purpose, nature, the pursuant documents, and etc.