Advance Search
Volume 36 Issue S2
Feb.  2025
Turn off MathJax
Article Contents
Yu Xiaoquan, Zhang Xiaoyu, Yu Deyong, Ceng Chang. Verification for Periodic Test Frequency Extension in Nuclear Power Plants[J]. Nuclear Power Engineering, 2015, 36(S2): 50-54. doi: 10.13832/j.jnpe.2015.S2.0050
Citation: Yu Xiaoquan, Zhang Xiaoyu, Yu Deyong, Ceng Chang. Verification for Periodic Test Frequency Extension in Nuclear Power Plants[J]. Nuclear Power Engineering, 2015, 36(S2): 50-54. doi: 10.13832/j.jnpe.2015.S2.0050

Verification for Periodic Test Frequency Extension in Nuclear Power Plants

doi: 10.13832/j.jnpe.2015.S2.0050
  • Received Date: 2015-11-04
  • Rev Recd Date: 2015-11-25
  • Available Online: 2025-02-15
  • Periodic test frequency shall be adjusted following the refueling cycle extension in nuclear power plants. This paper introduces the screening principle and verification methods for verification of periodic test frequency extension, and then takes containment spray system as an example, the feasibility of periodic test frequency extension is verified by the reliability analysis method. The quantitative result demonstrates that the reduction of system availability is acceptable to periodic test frequency extension.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (22) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return