Advance Search
Volume 37 Issue 2
Feb.  2025
Turn off MathJax
Article Contents
Chen Wenjun, Jiang Shengyao, Liang Manchun. Study on Emergency Planning Zone for Small Modular Reactors[J]. Nuclear Power Engineering, 2016, 37(2): 102-105. doi: 10.13832/j.jnpe.2016.02.0102
Citation: Chen Wenjun, Jiang Shengyao, Liang Manchun. Study on Emergency Planning Zone for Small Modular Reactors[J]. Nuclear Power Engineering, 2016, 37(2): 102-105. doi: 10.13832/j.jnpe.2016.02.0102

Study on Emergency Planning Zone for Small Modular Reactors

doi: 10.13832/j.jnpe.2016.02.0102
  • Received Date: 2015-08-05
  • Rev Recd Date: 2016-03-11
  • Available Online: 2025-02-15
  • The method of emergency planning for large nuclear reactors can not be applied to small nuclear reactors directly. The division of the emergency planning zone should give full consideration to the expected dose and the dose that may be affected by the public, and to determine the scope of the emergency plan by comparing the obtained dose data with the prescribed intervention level. Take the plume emergency planning zone outside which the expected dose not more than 10 m Sv as example, calculate the release of the source item level requirements under the constraints of the emergency planning zone by using MACCS, and give a detailed description of emergency plan zone of division and the calculation process.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (20) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return