Advance Search
Volume 37 Issue 5
Feb.  2025
Turn off MathJax
Article Contents
Lyu Huanwen, Jing Futing, Liu Jiajia, Wang Junlong, Yang Ping, Zhang Tao. Preliminary Study on Minimization of Emergency Planning Zone for Underground Nuclear Power Plant[J]. Nuclear Power Engineering, 2016, 37(5): 152-155. doi: 10.13832/j.jnpe.2016.05.0152
Citation: Lyu Huanwen, Jing Futing, Liu Jiajia, Wang Junlong, Yang Ping, Zhang Tao. Preliminary Study on Minimization of Emergency Planning Zone for Underground Nuclear Power Plant[J]. Nuclear Power Engineering, 2016, 37(5): 152-155. doi: 10.13832/j.jnpe.2016.05.0152

Preliminary Study on Minimization of Emergency Planning Zone for Underground Nuclear Power Plant

doi: 10.13832/j.jnpe.2016.05.0152
  • Received Date: 2016-04-04
  • Rev Recd Date: 2016-07-20
  • Available Online: 2025-02-15
  • An envelope accident was selected and corresponding source term was given. Then this paper made a calculation about the size of emergency planning zone. Calculation results show that the radioactive release of CUP600 to the environment is small, the effective dose and thyroid dose during the whole accident are both less than the general optimized intervention level. The plum emergency zone can be totally inside the site boundary, so technically, out site plum emergency planning zone can be eliminated.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (23) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return