Lyu Huanwen, Jing Futing, Liu Jiajia, Wang Junlong, Yang Ping, Zhang Tao. Preliminary Study on Minimization of Emergency Planning Zone for Underground Nuclear Power Plant[J]. Nuclear Power Engineering, 2016, 37(5): 152-155. doi: 10.13832/j.jnpe.2016.05.0152
Citation:
|
Lyu Huanwen, Jing Futing, Liu Jiajia, Wang Junlong, Yang Ping, Zhang Tao. Preliminary Study on Minimization of Emergency Planning Zone for Underground Nuclear Power Plant[J]. Nuclear Power Engineering, 2016, 37(5): 152-155. doi: 10.13832/j.jnpe.2016.05.0152
|
Lyu Huanwen, Jing Futing, Liu Jiajia, Wang Junlong, Yang Ping, Zhang Tao. Preliminary Study on Minimization of Emergency Planning Zone for Underground Nuclear Power Plant[J]. Nuclear Power Engineering, 2016, 37(5): 152-155. doi: 10.13832/j.jnpe.2016.05.0152
Citation:
|
Lyu Huanwen, Jing Futing, Liu Jiajia, Wang Junlong, Yang Ping, Zhang Tao. Preliminary Study on Minimization of Emergency Planning Zone for Underground Nuclear Power Plant[J]. Nuclear Power Engineering, 2016, 37(5): 152-155. doi: 10.13832/j.jnpe.2016.05.0152
|
Preliminary Study on Minimization of Emergency Planning Zone for Underground Nuclear Power Plant
-
1. Science and Technology on Reactor System Design Technology Laboratory, Nuclear Power Institute of China, Chengdu, 610213, China;
-
2. Changjiang Institute of Survey, Planning, Design and Research, Wuhan, 430010, China
- Received Date: 2016-04-04
- Rev Recd Date:
2016-07-20
Available Online:
2025-02-15