Advance Search
Volume 39 Issue 3
Jul.  2018
Turn off MathJax
Article Contents
Fang Yu, Xiong Guohua, Ma Shu, Cai Yefa, Kuang Dejun, Peng Chao. Research on Digital Upgrade Verification Platform Scheme for Simulation Control System of Daya Bay Nuclear Power Station[J]. Nuclear Power Engineering, 2018, 39(3): 81-85. doi: 10.13832/j.jnpe.2018.03.0081
Citation: Fang Yu, Xiong Guohua, Ma Shu, Cai Yefa, Kuang Dejun, Peng Chao. Research on Digital Upgrade Verification Platform Scheme for Simulation Control System of Daya Bay Nuclear Power Station[J]. Nuclear Power Engineering, 2018, 39(3): 81-85. doi: 10.13832/j.jnpe.2018.03.0081

Research on Digital Upgrade Verification Platform Scheme for Simulation Control System of Daya Bay Nuclear Power Station

doi: 10.13832/j.jnpe.2018.03.0081
  • Received Date: 2017-06-21
  • Rev Recd Date: 2018-01-29
  • Publish Date: 2018-07-20
  • According to the scope and actual situation of the existing simulation control system in Daya Bay Nuclear Power Station, the signal configuration, interface type and typical control loop are analyzed. In this paper, the technical requirements of the verification platform are put forward, and the verification platform based on DCS system, process simulation system and KRG system is set up. The specific verification contents are also given in detail. Using the verification platform to carry out the corresponding verification work, the differences before and after the improvement of the platform can be effectively identified to ensure the smooth implementation of digital upgrades.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (277) PDF downloads(173) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return