Advance Search
Volume 39 Issue 4
Aug.  2018
Turn off MathJax
Article Contents
Sun Zhan, Jiang Pingping, Zhang Wenguang, Jia Yanbo, Li Jiuzhen. Equipment Design and Management for First Unit of HPR1000[J]. Nuclear Power Engineering, 2018, 39(4): 148-151. doi: 10.13832/j.jnpe.2018.04.0148
Citation: Sun Zhan, Jiang Pingping, Zhang Wenguang, Jia Yanbo, Li Jiuzhen. Equipment Design and Management for First Unit of HPR1000[J]. Nuclear Power Engineering, 2018, 39(4): 148-151. doi: 10.13832/j.jnpe.2018.04.0148

Equipment Design and Management for First Unit of HPR1000

doi: 10.13832/j.jnpe.2018.04.0148
  • Publish Date: 2018-08-15
  • In the engineering design and management of the first unit of HPR1000, the design plan, the management method integrating the design planning, design interface and design procurement are adopted. Through the implementation of the opening items, risk management and other innovative mechanisms, each equipment design task is completed on schedule, to guarantee that the construction of the first unit of HPR1000 is on schedule.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (232) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return