Advance Search
Volume 40 Issue 2
Apr.  2019
Turn off MathJax
Article Contents
Shi Guilian, Zhang Bin, Yang Wenyu, Yin Baojuan. Priority Management System Scheme Design for ACPR1000 Reactor Protection System Based on FirmSys[J]. Nuclear Power Engineering, 2019, 40(2): 85-89. doi: 10.13832/j.jnpe.2019.02.0085
Citation: Shi Guilian, Zhang Bin, Yang Wenyu, Yin Baojuan. Priority Management System Scheme Design for ACPR1000 Reactor Protection System Based on FirmSys[J]. Nuclear Power Engineering, 2019, 40(2): 85-89. doi: 10.13832/j.jnpe.2019.02.0085

Priority Management System Scheme Design for ACPR1000 Reactor Protection System Based on FirmSys

doi: 10.13832/j.jnpe.2019.02.0085
  • Publish Date: 2019-04-15
  • Standard DI&C-ISG-04 and the functional requirements on priority management system (CIS) of ACPR1000 nuclear power unit are reviewed. Based on the experience feedback from CPR1000 nuclear power plant, difficulties in CIS design are analyzed and a scheme of RPS priority management system for ACPR1000 nuclear power plant reactor based on FirmSys is proposed. Compared with that of CPR1000 nuclear power station, the CIS for CPR1000 nuclear power plant is further optimized such as the localized design based on self-reliance, better prevention of software common cause failure, more reliable online periodic test, modular design with multiple interfaces, and onsite function design. and the design sheme has been successfully applied in ACPR1000 nuclear power station.. The practice shows that the CIS scheme proposed in this paper is a feasible scheme.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (299) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return