Zhao Guobin, Hu Anzhong, Bie Chao, Jiang Shujie. Improvement of Ultrasonic Testing Process for Bottom Seal Head and Pipe Plate Circumferential Weld of Steam Generator in EPR Project[J]. Nuclear Power Engineering, 2019, 40(2): 137-140. doi: 10.13832/j.jnpe.2019.02.0137
Citation: Zhao Guobin, Hu Anzhong, Bie Chao, Jiang Shujie. Improvement of Ultrasonic Testing Process for Bottom Seal Head and Pipe Plate Circumferential Weld of Steam Generator in EPR Project[J]. Nuclear Power Engineering, 2019, 40(2): 137-140. doi: 10.13832/j.jnpe.2019.02.0137

Improvement of Ultrasonic Testing Process for Bottom Seal Head and Pipe Plate Circumferential Weld of Steam Generator in EPR Project

doi: 10.13832/j.jnpe.2019.02.0137
  • Publish Date: 2019-04-15
  • The bottom seal head and the pipe plate circumferential weld of the steam generator in EPR project is the important boundary of the first loop. Because of the large thickness and the spherical shape of the weld, the ultrasonic inspection process should be made with full consideration of the effects such as the attenuation of the probe sound beam and the change of the angle of the probe, so as to meet the requirements of relevant inspection standards. With the in-depth study of the RCC-M and EN 1713 standards, conclusions can be made based on the analysis and simulation of the energy and angle change of the probe, that, by adding a 60 degree probe in the inspection process, the requirements of standard can be satisfied, and the risk of missing dangerous defects can be reduced so that the quality of nuclear safety equipment can be ensured.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (273) PDF downloads(4) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return