Xu Ying, Xu Jinquan, Yang Zongwei, Yu Hang. Analysis and Optimization of Frequent Isolation of Steam Generator Blowdown System in CPR1000 Nuclear Power Plant[J]. Nuclear Power Engineering, 2019, 40(6): 163-167. doi: 10.13832/j.jnpe.2019.06.0163
Citation: Xu Ying, Xu Jinquan, Yang Zongwei, Yu Hang. Analysis and Optimization of Frequent Isolation of Steam Generator Blowdown System in CPR1000 Nuclear Power Plant[J]. Nuclear Power Engineering, 2019, 40(6): 163-167. doi: 10.13832/j.jnpe.2019.06.0163

Analysis and Optimization of Frequent Isolation of Steam Generator Blowdown System in CPR1000 Nuclear Power Plant

doi: 10.13832/j.jnpe.2019.06.0163
  • Publish Date: 2019-12-15
  • The steam generator blowdown system (APG) of CPR1000 nuclear power plant is frequently automatically isolated during normal operation. In combination with the operating background of the isolation events, the causes of these events are studied, and APG is optimized. The D link is added to the cooling water temperature controller and the control parameters are optimized; the feedforward link is added to the sewage flow control loop; the corresponding delay links are added to the downstream of sewage flowmeter and pressure switch signal; the adaptive modification is made to the operation program of the start-up stage. The actual operation of the nuclear power plant has proved that the improved system is in better operation condition, the automatic isolation events are greatly reduced, and the operation and maintenance costs are effectively lowered.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (365) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return