Advance Search
Volume 42 Issue 1
Jan.  2021
Turn off MathJax
Article Contents
An Yanbo, Yu Zhiwei, Li Na, Wang Bingyan, Xiong Siyong, Zhang Anrui. Research on Positioning of HPR1000 Reactor Detector Replacement[J]. Nuclear Power Engineering, 2021, 42(1): 161-166. doi: 10.13832/j.jnpe.2021.01.0161
Citation: An Yanbo, Yu Zhiwei, Li Na, Wang Bingyan, Xiong Siyong, Zhang Anrui. Research on Positioning of HPR1000 Reactor Detector Replacement[J]. Nuclear Power Engineering, 2021, 42(1): 161-166. doi: 10.13832/j.jnpe.2021.01.0161

Research on Positioning of HPR1000 Reactor Detector Replacement

doi: 10.13832/j.jnpe.2021.01.0161
  • Publish Date: 2021-01-23
  • In the process of replacing HPR1000 reactor detector, the first step is to position the reactor detector replacement above the detector. This paper proposes the positioning requirements of the reactor detector replacement firstly, and then analyzes the position system combined with the process of replacing reactor detector, and proposes the closed loop visual servo positioning scheme of reactor detector replacement. This technical scheme fulfills the position accuracy requirement, ensures the detector a small deflection angle during lifting and mitigates the wear of the mechanical seal joint .

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (203) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return