Citation: | Huang Huiming, Yu Weiming, Wu Jiabin. Selection and Practice of First of a Kind Test for EPR Unit[J]. Nuclear Power Engineering, 2021, 42(4): 239-243. doi: 10.13832/j.jnpe.2021.04.0239 |
[1] |
国家核安全局. 核动力厂运行安全规定: HAF103—2004[S]. 北京: 法律出版社, 2004: 1-25.
|
[2] |
国家核安全局. 核电厂调试程序: HAD103—02[S]. 北京: 法律出版社, 1987: 1394-1426.
|
[3] |
IAEA. Commissioning for nuclear power plants: NS-G-2.9[S]. Vienna: IAEA, 2003: 47.
|
[4] |
NRC. Initial test programs for water-cooled nuclear power plants: RG 1.68[S]. Washington, DC: U. S. Nuclear Regulatory Commission, 2007: 13-22.
|
[5] |
VIERNE Vincent. Design transient specification list of loading conditions[Z]. 2018.
|
[6] |
LHOYER STEPHANIE. Design transient specification categories 3&4 primary and secondary systems[Z]. 2009
|