Citation: | Zhang Jiajia, Deng Wei, Xiao Jun, Gong Yu. Study on Function Extension of Pressurizer Fast Depressurization System for Gen Ⅲ PWR NPPs[J]. Nuclear Power Engineering, 2021, 42(5): 162-166. doi: 10.13832/j.jnpe.2021.05.0162 |
[1] |
陈钟钧. 稳压器快速卸压阀(截止阀)的功能特性研究[D]. 甘肃: 兰州理工大学, 2017.
|
[2] |
XING J, SONG D Y, WU Y X. HPR1000: advanced pressurized water reactor with active and passive safety[J]. Engineering, 2016, 2(1): 79-87. doi: 10.1016/J.ENG.2016.01.017
|
[3] |
邢继. 华龙一号能动与非能动相结合的先进压水堆核电厂[M]. 北京: 中国原子能出版社, 2016:140-142.
|
[4] |
刘萍萍,张宁. 概率安全评价在CPR1000机组严重事故预防与缓解措施分析中的应用[J]. 原子能科学技术,2011, 45(4): 430-435.
|
[5] |
张佳佳,倪曼,肖军,等. 二级PSA在严重事故管理中的应用研究[J]. 核动力工程,2020, 41(5): 74-78.
|
[6] |
EIDE S A, WIERMAN T E, GENTILLON C D, et al. Industry average performance for components and initiating events at U. S. commercial nuclear power plants: NUREG/CR—6928[R]. Washington, D.C.: U.S Nuclear Regulatory Commission, 2007.
|
[7] |
Nuclear Regulatory Commission. Common -cause failure parameter estimations, 2012 Update: NUREG /CR—5497[R]. Washington, D.C.: U.S. Nuclear Regulatory Commission, 2012.
|
[8] |
GERMAN D, BLACKMAN H, MARBLE J, et al. The SPAR-H human reliability analysis method: NUREG/ CR—6883[R]. Washington, D.C.: U.S. Nuclear Regulatory Commission, 2005.
|