Citation: | Liu Lixin, Wang Zhe. Optimization Research of SGTR Procedure for Nuclear Power Plant[J]. Nuclear Power Engineering, 2022, 43(4): 126-130. doi: 10.13832/j.jnpe.2022.04.0126 |
[1] |
叶成,郑明光,王勇,等. AP1000应急运行规程接口分析[J]. 核动力工程,2013, 34(3): 164-167,174. doi: 10.3969/j.issn.0258-0926.2013.03.039
|
[2] |
LIU L X. Research on impact of pressurizer heater block on SGTR overfill analysis[C]//2017 25th International Conference on Nuclear Engineering. Shanghai, 2017: 2-4.
|
[3] |
柯晓. CAP1000核电厂全功率范围SGTR事故研究[J]. 原子能科学技术,2014, 48(6): 1031-1037. doi: 10.7538/yzk.2014.48.06.1031
|
[4] |
MARSH L B. Evaluation of steam generator tube rupture events: NUREG-0651[R]. Washington: NRC, 1980.
|
[5] |
蒋孝蔚,邓坚,邱志方,等. 安全壳背压对SGTR事故进程的影响研究[J]. 核动力工程,2019, 40(5): 180-183.
|
[6] |
刘立欣,刘展. SGTR事故SG满溢分析扩展研究[J]. 核动力工程,2020, 41(3): 81-85.
|