Advance Search
Volume 43 Issue 4
Aug.  2022
Turn off MathJax
Article Contents
Lyu Fangming, Lei Cheng, Guo Lixia, Shi Yan, Wang Yadong. Investigation on Screening and Ranking of Life Cycle Management Objects in Nuclear Power Plant[J]. Nuclear Power Engineering, 2022, 43(4): 201-205. doi: 10.13832/j.jnpe.2022.04.0201
Citation: Lyu Fangming, Lei Cheng, Guo Lixia, Shi Yan, Wang Yadong. Investigation on Screening and Ranking of Life Cycle Management Objects in Nuclear Power Plant[J]. Nuclear Power Engineering, 2022, 43(4): 201-205. doi: 10.13832/j.jnpe.2022.04.0201

Investigation on Screening and Ranking of Life Cycle Management Objects in Nuclear Power Plant

doi: 10.13832/j.jnpe.2022.04.0201
  • Received Date: 2021-06-01
  • Rev Recd Date: 2021-07-12
  • Publish Date: 2022-08-04
  • The objects of life cycle management (LCM) are systems or equipment that have an important impact on the safety, availability and economy of power plants. How to identify these objects is the basis of LCM. Based on the study of the traditional life cycle management object screening and ranking method of Electric Power Research Institute (EPRI), and combined with the present situation and demand of equipment management of Chinese nuclear power enterprises, a screening method which takes into account both equipment criticality and economic factors is put forward. Besides, the hierarchical attributes that can reflect the functional importance and the actual operation and maintenance status of the equipment are established, and the weight of each attribute is calculated by the analytic hierarchy process, and then the priority rankings of the LCM objects are determined. The application results in a nuclear power unit show that this quantitative screening and ranking method is in line with industry experience and the actual operation and maintenance status of equipment, and has important application value and practical guiding significance.

     

  • loading
  • [1]
    SLITER G. Nuclear plant life cycle management implementation guide: TR-106109[R]. California USA: EPRI, 1998.
    [2]
    MELVIN A. Demonstration of life cycle management planning for systems, structures, and components with pilot applications at Oconee and prairie island nuclear stations: 1000806[R]. California USA: EPRI, 2001.
    [3]
    戴忠华,刘鹏,卢文跃,等. 大亚湾核电站的老化和寿命管理[J]. 核动力工程,2005, 26(S1): 87-89+115.
    [4]
    孔德萍,李华,郑宏练. 秦山核电厂反应堆压力容器寿命管理[J]. 核动力工程,2008, 29(6): 110-114.
    [5]
    SLITER G. Life cycle management planning sourcebook-overview report: 1003058[R]. California USA: EPRI, 2001.
    [6]
    王子刚. 电站设备维修决策及优化模型研究[D]. 北京: 华北电力大学, 2008: 26-27.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Tables(5)

    Article Metrics

    Article views (247) PDF downloads(31) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return