Advance Search
Volume 43 Issue 5
Oct.  2022
Turn off MathJax
Article Contents
Chen Qing, Guo Xing, Gao Xuan, Qiu Xinyuan, Wang Guangjin, Duan Xuxing, Zhao Chuanli, Jiang Shenghan. Requalification Experimental Study on Life Extension of Electrical Instrument Equipment in Nuclear Power Plant[J]. Nuclear Power Engineering, 2022, 43(5): 217-222. doi: 10.13832/j.jnpe.2022.05.0217
Citation: Chen Qing, Guo Xing, Gao Xuan, Qiu Xinyuan, Wang Guangjin, Duan Xuxing, Zhao Chuanli, Jiang Shenghan. Requalification Experimental Study on Life Extension of Electrical Instrument Equipment in Nuclear Power Plant[J]. Nuclear Power Engineering, 2022, 43(5): 217-222. doi: 10.13832/j.jnpe.2022.05.0217

Requalification Experimental Study on Life Extension of Electrical Instrument Equipment in Nuclear Power Plant

doi: 10.13832/j.jnpe.2022.05.0217
  • Received Date: 2021-10-19
  • Accepted Date: 2021-10-19
  • Rev Recd Date: 2022-04-21
  • Publish Date: 2022-10-12
  • On the basis of the research results of environmental qualification of electrical instrument equipment in nuclear power plant, the life extension requalification analysis and experimental research of electrical instrument equipment in nuclear power plant are carried out. Taking the DDG-1 electrical penetration assembly (EPA) of Qinshan Nuclear Power Co., Ltd. as the research object, the principles for requalification experimental study are formulated according to the actual operation. Based on these principles, the test scheme, test item sequence and EPA repair basis and scheme are determined by combining the analysis method, and requalification experimental study is carried out on this basis. The properly repaired DDG-1 EPA passed the test of equipment performance with time, seismic test, thermodynamic test under design basis accident (DBA) conditions and ultimate electrical performance test after DBA in sequence according to the test scheme. Its state is intact after the test, which indicates that the DDG-1 EPA can achieve the expected goal of continuing to extend its life for 20 years after proper repair, and can provide guidance and reference for the requalification experimental study of other electrical instruments in nuclear power plants.

     

  • loading
  • [1]
    TSVETKOV P V. Nuclear power - control, reliability and human factors[M]. London: IntechOpen, 2011: 289-310.
    [2]
    LEE S H, LEE J D, KIM M Y, et al. Evaluation of accelerated ageing cables used in nuclear power plant[C]//Proceedings of 2012 IEEE International Conference on Condition Monitoring and Diagnosis. Bali: IEEE, 2012: 681-684.
    [3]
    SMITH R J. Electrical equipment qualified life extension through area temperature monitoring[C]//Proceedings of 1995 IEEE Nuclear Science Symposium and Medical Imaging Conference Record. San Francisco: IEEE, 1995: 872-875.
    [4]
    刘文静,谢峰,韩勇,等. 核电厂电仪设备的老化评估筛选[J]. 科技视界,2016(10): 11-12. doi: 10.3969/j.issn.2095-2457.2016.10.006
    [5]
    王新宇,王广金,周天,等. 核电厂电气贯穿件设备延寿再鉴定方法研究[J]. 核动力工程,2020, 41(1): 140-144. doi: 10.13832/j.jnpe.2020.01.0140
    [6]
    国家能源局. 核电厂安全级电气设备老化管理: NB/T 20155—2012[S]. 北京: 中国原子能出版社, 2013
    [7]
    黄立军,陈世均,黄卫刚,等. 核电站重要敏感设备加速老化管理研究与应用[J]. 核科学与工程,2011, 31(2): 185-192.
    [8]
    GUO J, LIU Y J, GU K K, et al. Ageing management system of the steam generator of the nuclear power plant[C]//Proceedings of the First International Conference on Information Science and Engineering. Nanjing: IEEE, 2009: 2266-2269.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(4)  / Tables(4)

    Article Metrics

    Article views (222) PDF downloads(25) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return