Citation: | Yang Zhe. Review Strategy of Application for Extension of Validity Period of Operation License for Research Reactor[J]. Nuclear Power Engineering, 2022, 43(6): 151-154. doi: 10.13832/j.jnpe.2022.06.0151 |
[1] |
龚嶷,崔满满,窦一康,等. 核电厂运行许可证延续(OLE)安全监管的对策[J]. 核安全,2015, 14(1): 1-11. doi: 10.3969/j.issn.1672-5360.2015.01.001
|
[2] |
宋琛修,朱立新. 研究堆的分类和基于分类的安全监管思路探讨[J]. 核安全,2013, 12(S1): 134-137.
|
[3] |
高泉源. 研究堆老化管理的法规依据、现状及建议[J]. 核安全,2006(4): 1-8. doi: 10.3969/j.issn.1672-5360.2006.04.001
|
[4] |
IAEA. Ageing Management for Research Reactors: Specific Safety Guide: SSG-10[R]. Geneva: IAEA, 2010.
|
[5] |
SANWARWALLA M H. Time limited aging analyses requirements for license renewal for U.S. nuclear power plants[C]//JSME 2004 Pressure Vessels and Piping Conference. U.S.: ASME, 2004.
|
[6] |
U.S.NRC. Industry guideline for implementing the requirements of CFR part 54-the license renewal rule: NEI95-10[R]. Washingtong: NEI, 2005.
|
[7] |
U. S. NRC. Standard review plan for review of license renewal applications for nuclear power plants: NUREG-1800[R]. Washington: U. S. Nuclear Regulatory Commission, 2010.
|
[8] |
U. S. NRC. Generic aging lessons learned (GALL) report: NUREG-1801[R]. Washington: U. S. Nuclear Regulatory Commission, 2001.
|