Advance Search
Volume 43 Issue S1
Jul.  2022
Turn off MathJax
Article Contents
Kong Deping. Long-term Operation Practice of Qinshan Nuclear Power Plant[J]. Nuclear Power Engineering, 2022, 43(S1): 1-6. doi: 10.13832/j.jnpe.2022.S1.0001
Citation: Kong Deping. Long-term Operation Practice of Qinshan Nuclear Power Plant[J]. Nuclear Power Engineering, 2022, 43(S1): 1-6. doi: 10.13832/j.jnpe.2022.S1.0001

Long-term Operation Practice of Qinshan Nuclear Power Plant

doi: 10.13832/j.jnpe.2022.S1.0001
  • Received Date: 2022-01-18
  • Rev Recd Date: 2022-03-18
  • Publish Date: 2022-06-15
  • Qinshan Nuclear Power Plant is the first nuclear power unit in Chinese Mainland facing the operation license extension (OLE), and the first nuclear power unit in Chinese Mainland approved to extend its operation for 20 years. This paper introduces the operation license technical system and corresponding process of Qinshan Nuclear Power Plant. The successful experience of OLE in Qinshan Nuclear Power Plant can be used for reference and demonstration for the long-term operation of subsequent nuclear power plants.

     

  • loading
  • [1]
    OECD/NEA. Long-term operation of nuclear power plants and decarbonisation strategies[R]. Paris: OECD/NEA, 2021.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(4)

    Article Metrics

    Article views (55) PDF downloads(18) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return