Citation: | Kong Jing, Zhang Qi, Chen Zixi, Gao Xuan. Study on Aging Management Review of Electric and I&C Equipment in Evaluation of Nuclear Power Plant Operation License Extension[J]. Nuclear Power Engineering, 2022, 43(S1): 60-64. doi: 10.13832/j.jnpe.2022.S1.0060 |
[1] |
U. S. NRC. Status of license renewal applications and industry activities[R]. Washington, DC: U. S. NRC, 2019.
|
[2] |
叶奇蓁. 后福岛时期我国核电的发展[J]. 中国电机工程学报,2012, 32(11): 1-8.
|
[3] |
国家核安全局. <核电厂运行许可证>有效期限延续的技术政策(试行), 国核安发[2015]280号[EB/OL]. 北京: 中华人民共和国环境保护部. [2015-12-31].https://www.mee.gov.cn/gkml/sthjbgw/haq/201601/t20160105_321062.htm.
|
[4] |
NRC. Standard review plan for review of license renewal applications for nuclear power plants: NUREG-1800, revision 2[R]. Washington, DC: Office of Nuclear Reactor Regulation, 2010.
|
[5] |
NRC. Generic aging Lessons Learned (GALL) report- final report: NUREG-1801, revision 2[R]. Washington, DC: Office of Nuclear Reactor Regulation, 2010.
|
[6] |
Nuclear Energy Institute. Industry guideline for implementing the requirements of 10 CFR Part 54 – the license renewal rule: NEI 95-10, revision 6[R]. Washington, DC: Nuclear Energy Institute, 2005.
|
[7] |
EPRI. Plant support engineering: license renewal electrical handbook: EPRI 1003057, revision 1[R]. Palo Alto: Electric Power Research Institute, 2007.
|