Advance Search
Volume 45 Issue 2
Apr.  2024
Turn off MathJax
Article Contents
Xu Ying, Yang Wu, Liu Shengzhi, Jiang Xiaolong, Zhao Ke, Yang Jin. Research and Practice on Transformation Scheme of Hand Operator in Main Control Room of Nuclear Power Plant Based on Digital System[J]. Nuclear Power Engineering, 2024, 45(2): 187-192. doi: 10.13832/j.jnpe.2024.02.0187
Citation: Xu Ying, Yang Wu, Liu Shengzhi, Jiang Xiaolong, Zhao Ke, Yang Jin. Research and Practice on Transformation Scheme of Hand Operator in Main Control Room of Nuclear Power Plant Based on Digital System[J]. Nuclear Power Engineering, 2024, 45(2): 187-192. doi: 10.13832/j.jnpe.2024.02.0187

Research and Practice on Transformation Scheme of Hand Operator in Main Control Room of Nuclear Power Plant Based on Digital System

doi: 10.13832/j.jnpe.2024.02.0187
  • Received Date: 2023-06-01
  • Rev Recd Date: 2023-12-18
  • Publish Date: 2024-04-12
  • The instrument and control system of Daya Bay Nuclear Power Station is based on analog electronic technology, and it is planned to be digitized during the 30-year overhaul, during which the first-floor analog system will be completely digitized, but the man-machine interface equipment on the second floor will still be controlled by the hard hand operator in the main control room. According to the market research, four transformation schemes of hand operator based on digital system are preliminarily determined. Finally, the overall transformation scheme of developing new hand operator through standard I/O board interface is determined by considering many factors such as functional consistency, product reliability, technical feasibility, development cost, input/output (I/O) signal distribution efficiency and application feedback. This scheme can realize the optimal interface between the hand operator and the transfomed digital system, and effectively improve the utilization efficiency of I/O board channels. At the same time, through the rich software algorithm block function and digital system fault diagnosis function, the improvement measures such as automatic undisturbed switching of actuator and forced manual switching of process signal quality level are added, which effectively improves the reliability and stability of unit equipment control and provides an important reference scheme for similar digital transformation projects.

     

  • loading
  • [1]
    徐颖,张强,许金泉,等. 基于DCS改造最小验证平台的稳压器压力控制回路比对测试研究[J]. 核动力工程,2021, 42(1): 90-94.
    [2]
    广东核电培训中心. 900MW压水堆核电站系统与设备[M]. 北京: 原子能出版社,2005: 305-309.
    [3]
    徐颖,张国军,赵浩,等. 大亚湾核电站数字化改造项目关键敏感设备降级措施研究[J]. 核动力工程,2023, 44(2): 185-190.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(5)  / Tables(5)

    Article Metrics

    Article views (31) PDF downloads(12) Cited by()