Citation: | Zou Wei, Lin Genxian, Sun Yun. Primary Zinc Injection Technology Application and Zinc Injection and Dosing Equipment Design[J]. Nuclear Power Engineering, 2024, 45(2): 203-206. doi: 10.13832/j.jnpe.2024.02.0203 |
[1] |
王力. 加锌对一回路材料氧化膜结构影响及其机理研究[D]. 上海: 上海交通大学,2012.
|
[2] |
姜苏青. 注锌对压水堆核电站一回路结构材料腐蚀行为影响的研究[D]. 上海: 上海交通大学,2012.
|
[3] |
DESHON J. Pressurized water reactor fuel impact assessment for injecting zinc at a high-duty PWR: Callaway[R]. Palo Alto: EPRI, 2003.
|
[4] |
HAAS C, REID R. Pressurized water reactor primary zinc application sourcebook, revision 1[Z]. USA: EPRI, 2012.
|
[5] |
FRATTINI P, FRUZZETTI K. Overcoming solubility limitations to zinc addition in pressurized water reactors[Z]. Palo Alto, USA: EPRI, 2001.
|
[6] |
FRUZZETTI K. Overview report on zinc addition in pressurized water reactors-2004: 1009568[R]. Palo Alto: EPRI, 2004.
|
[7] |
廖家鹏,毛玉龙,阮天鸣,等. 注锌对燃料包壳表面污垢沉积及硼析出的影响研究[J]. 核技术,2023, 46(3): 030603. doi: 10.11889/j.0253-3219.2023.hjs.46.030603
|
[8] |
GOLD R E, KORMUTH J W, BERGMANN C A, et al. Evaluation of zinc addition to the primary coolant of PWRs[Z]. USA: EPRI, 1996.
|
[9] |
GOLD R E, KORMUTH J W, BERGMANN C A, et al. Evaluation of zinc addition on fuel cladding at the Halden test reactor[Z]. USA: EPRI, 1996.
|
[10] |
GOLD R E, KORMUTH J W. Evaluation of zinc addition to the primary coolant of PWRs: fuel cladding corrosion[Z]. USA: EPRI, 1996.
|
[11] |
BYERS W A, WANG G. WALT loop crud thermal conductivity/zinc project update[C]. Tucson AZ: EPRI Fuel Reliability Program PWR Fuel Corrosion and Crud Winter Meeting, 2012.
|
[12] |
MORITA S. Demonstration of zinc injection technique in Fugen nuclear power station[C]. Japan: 2005 ISOE Asian ALARA Symposium, 2005.
|