Citation: | Yan Guohua, Chen Shu, Li Wei, Xiao Aiwu, Yu Yingming. Research on Full-Cover Fixed Ultrasonic Inspection Technology for AP1000 Control Rod[J]. Nuclear Power Engineering, 2024, 45(3): 241-245. doi: 10.13832/j.jnpe.2024.03.0241 |
[1] |
周红,肖志,陶书生,等. 运行核电厂控制棒组件及其驱动机构异常事件的经验反馈[J]. 核安全,2013(1): 19-22, 35. doi: 10.3969/j.issn.1672-5360.2013.01.005
|
[2] |
MATSUOKA T, YAMAGUCHI Y, YONEZAWA T, et al. Cladding tube cracking caused by absorber swelling for PWR RCCA rodlets[J]. Journal of Nuclear Science and Technology, 1999, 36(7): 584-595. doi: 10.1080/18811248.1999.9726242
|
[3] |
陈军. 田湾核电站控制棒组件检测系统科研项目风险管理[D]. 长春: 吉林大学,2011.
|
[4] |
蔡家藩,陈增武,乔维,等. 核电站反应堆控制棒束组件自动检查[J]. 无损检测,2013, 35(5): 71-74, 77.
|