Yan Guohua, Chen Shu, Li Wei, Xiao Aiwu, Yu Yingming. Research on Full-Cover Fixed Ultrasonic Inspection Technology for AP1000 Control Rod[J]. Nuclear Power Engineering, 2024, 45(3): 241-245. doi: 10.13832/j.jnpe.2024.03.0241
Citation: Yan Guohua, Chen Shu, Li Wei, Xiao Aiwu, Yu Yingming. Research on Full-Cover Fixed Ultrasonic Inspection Technology for AP1000 Control Rod[J]. Nuclear Power Engineering, 2024, 45(3): 241-245. doi: 10.13832/j.jnpe.2024.03.0241

Research on Full-Cover Fixed Ultrasonic Inspection Technology for AP1000 Control Rod

doi: 10.13832/j.jnpe.2024.03.0241
  • Received Date: 2023-09-25
  • Rev Recd Date: 2023-10-26
  • Publish Date: 2024-06-13
  • The control rod assembly is the component inserted into the fuel assembly to control the reactivity of the reactor core, so its status needs to be evaluated timely to ensure the safety of the plant operation. According to the structure and size of AP1000 control rod, the full-cover fixed ultrasonic inspection technology is studied in this paper, and the special inspection device is developed. Through the test of the mock-up flaw rod, it is known that the axial measurement accuracy of the flaw is ≤1 mm and the wall thickness measurement accuracy is <0.01 mm. The device has been successfully applied in the field overhaul of AP1000 unit, and several wear and swelling defects have been found. The application results show that the full-cover fixed ultrasonic inspection technology can visually display the defects of the control rod cladding, and give information such as the position, axial length, circumferential span and maximum wear depth of the defects.

     

  • loading
  • [1]
    周红,肖志,陶书生,等. 运行核电厂控制棒组件及其驱动机构异常事件的经验反馈[J]. 核安全,2013(1): 19-22, 35. doi: 10.3969/j.issn.1672-5360.2013.01.005
    [2]
    MATSUOKA T, YAMAGUCHI Y, YONEZAWA T, et al. Cladding tube cracking caused by absorber swelling for PWR RCCA rodlets[J]. Journal of Nuclear Science and Technology, 1999, 36(7): 584-595. doi: 10.1080/18811248.1999.9726242
    [3]
    陈军. 田湾核电站控制棒组件检测系统科研项目风险管理[D]. 长春: 吉林大学,2011.
    [4]
    蔡家藩,陈增武,乔维,等. 核电站反应堆控制棒束组件自动检查[J]. 无损检测,2013, 35(5): 71-74, 77.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(7)  / Tables(3)

    Article Metrics

    Article views (20) PDF downloads(6) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return