Citation: | Hua Xinchao, Pan Deng, Li Yao, Peng Yipeng, Liu Jiaqing. Feasibility Study of 24-month Refueling for VVER[J]. Nuclear Power Engineering, 2025, 46(1): 24-29. doi: 10.13832/j.jnpe.2025.01.0024 |
[1] |
位金锋,许星星,付学峰,等. 177堆芯24个月换料可行性研究[J]. 强激光与粒子束,2017, 29(1): 016020. doi: 10.11884/HPLPB201729.160336
|
[2] |
SECKER J R, JOHANSEN B J, STUCKER D L, et al. Optimum discharge burnup and cycle length for PWRs[J]. Nuclear Technology, 2005, 151(2): 109-119. doi: 10.13182/NT05-A3636
|
[3] |
GREGG R, WORRALL A. Effect of highly enriched/highly burnt UO2 fuels on fuel cycle costs, radiotoxicity, and nuclear design parameters[J]. Nuclear Technology, 2005, 151(2): 126-132. doi: 10.13182/NT05-A3638
|
[4] |
HOVE C. 24-month PWR fuel cycles-Two decades of AREVA design and operating experience[C]//Topical meeting on advances in nuclear fuel managment. Virginia: AREVA Inc., 2015.
|
[5] |
王丹,王金雨. 24个月换料周期燃料管理初步研究[J]. 核动力工程,2013, 34(S1): 99-102.
|
[6] |
王丽华,曹泓,杨波,等. 核电厂多种长周期换料策略研究及改进[J]. 核科学与工程,2019, 39(6): 922-927. doi: 10.3969/j.issn.0258-0918.2019.06.010
|
[7] |
钱纪生. WWER-1000压水堆核电厂运行物理[M]. 北京: 中国原子能出版社,2011: 260-279.
|
[8] |
姚红,刘国明,高鑫. 157组组件堆芯燃料管理方案设计及其经济性分析[J]. 核科学与工程,2016, 36(2): 273-278. doi: 10.3969/j.issn.0258-0918.2016.02.021
|