ZHANG Tian-yi, WAN Li, SHI Li, ZHANG Chuan-yong. FE Simulation of Bolt-up Process for Press-Retraining Bolts of HTR-PM Pressure Vessel[J]. Nuclear Power Engineering, 2011, 32(S1): 54-56.
Citation:
|
ZHANG Tian-yi, WAN Li, SHI Li, ZHANG Chuan-yong. FE Simulation of Bolt-up Process for Press-Retraining Bolts of HTR-PM Pressure Vessel[J]. Nuclear Power Engineering, 2011, 32(S1): 54-56.
|
ZHANG Tian-yi, WAN Li, SHI Li, ZHANG Chuan-yong. FE Simulation of Bolt-up Process for Press-Retraining Bolts of HTR-PM Pressure Vessel[J]. Nuclear Power Engineering, 2011, 32(S1): 54-56.
Citation:
|
ZHANG Tian-yi, WAN Li, SHI Li, ZHANG Chuan-yong. FE Simulation of Bolt-up Process for Press-Retraining Bolts of HTR-PM Pressure Vessel[J]. Nuclear Power Engineering, 2011, 32(S1): 54-56.
|
FE Simulation of Bolt-up Process for Press-Retraining Bolts of HTR-PM Pressure Vessel
-
1. Institute of Nuclear and New Energy Technology, Tsinghua University, Beijing, 100084, China;
-
2. Japan Technostar Company, Beijing Office, Beijing, 100098, China
- Received Date: 2011-02-25
- Rev Recd Date:
2011-05-18
Available Online:
2025-03-08