XIE Yong-cheng, WANG Chi-hu, DOU Yi-kang. AP1000 Equipment Qualification Requirements and Comparisons to Existing Domestic Qualification Capabilities[J]. Nuclear Power Engineering, 2011, 32(S1): 159-161.
Citation:
|
XIE Yong-cheng, WANG Chi-hu, DOU Yi-kang. AP1000 Equipment Qualification Requirements and Comparisons to Existing Domestic Qualification Capabilities[J]. Nuclear Power Engineering, 2011, 32(S1): 159-161.
|
XIE Yong-cheng, WANG Chi-hu, DOU Yi-kang. AP1000 Equipment Qualification Requirements and Comparisons to Existing Domestic Qualification Capabilities[J]. Nuclear Power Engineering, 2011, 32(S1): 159-161.
Citation:
|
XIE Yong-cheng, WANG Chi-hu, DOU Yi-kang. AP1000 Equipment Qualification Requirements and Comparisons to Existing Domestic Qualification Capabilities[J]. Nuclear Power Engineering, 2011, 32(S1): 159-161.
|
AP1000 Equipment Qualification Requirements and Comparisons to Existing Domestic Qualification Capabilities
-
1. Shanghai Nuclear Engineering Research and Design Institute, Shanghai, 200233, China;
-
2. Shanghai Key Laboratory on Nuclear Power Engineering, Shanghai, 200233, China
- Received Date: 2011-01-10
- Rev Recd Date:
2011-03-15
Available Online:
2025-03-08