ZHANG Ke, LI Jia-bin, WANG Dong. Precise Prefabrication of Primary Pipes Automatic Welding in CPR1000 Nuclear Island Installation[J]. Nuclear Power Engineering, 2013, 34(6): 121-124.
Citation: ZHANG Ke, LI Jia-bin, WANG Dong. Precise Prefabrication of Primary Pipes Automatic Welding in CPR1000 Nuclear Island Installation[J]. Nuclear Power Engineering, 2013, 34(6): 121-124.

Precise Prefabrication of Primary Pipes Automatic Welding in CPR1000 Nuclear Island Installation

  • Received Date: 2012-08-08
  • Rev Recd Date: 2012-10-11
  • Available Online: 2025-03-08
  • The precise prefabrication of primary pipes is a prerequisite for the successful implementation of primary pipes automatic welding technology. Based on the geometric characteristics of the primary equipments(including RPV, SG and RCP) and primary pipes, it presents a pertinent completion size measurement scheme for calculating the processing data of primary pipes weld grooves, in order to digest the primary equipments manufacture error; and then through the development of the weld grooves processing program to ensure the machining accuracy of the weld grooves, and ultimately to ensure the precise prefabrication of primary pipes automatic welding in CPR1000 nuclear island installation.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (21) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return