Hu Chenxu. Simulation Research of Ultrasonic Inspection of Primary Tube  Seat Weld in Nuclear Power Plants[J]. Nuclear Power Engineering, 2020, 41(2): 145-149.
Citation: Hu Chenxu. Simulation Research of Ultrasonic Inspection of Primary Tube  Seat Weld in Nuclear Power Plants[J]. Nuclear Power Engineering, 2020, 41(2): 145-149.

Simulation Research of Ultrasonic Inspection of Primary Tube  Seat Weld in Nuclear Power Plants

  • Publish Date: 2020-04-11
  • The small-size branch joint (BOSS) weld is the weak point of the primary pressure boundary in nuclear power plants, and its monitoring is critical but difficulty in the daily and in-service inspection. This paper designs and verifies the ultrasonic phased array inspection technology for BOSS welds, by using the simulation technology, technical test and application verification, and also solves the difficulties of monitoring BOSS welds in daily and in-service overhaul of nuclear power plants. The method of design and verification can be used in similar ultrasonic phased array inspection process.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (156) PDF downloads(2) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return