As one of the basic technical guidance documents for nuclear power plant commissioning, the standard commissioning guidelines are designed to perform commissioning test with the common method for a same type of equipments and components, or a given type of test. Based on the requirements of domestic and foreign regulations and standards, by analyzing the design characteristics and commissioning task requirements of native advanced pressurized water reactor(PWR)nuclear power plant, a common design methodology of standard commissioning guidelines for native advanced PWR is given. Combined with the commissioning experience of the second generation PWR, a system of standard commissioning guidelines with independent intellectual property is designed for native advanced PWR and a new form of document classification and coding is determined, to reduce the risk of misquotes and misuses, and to reduce the workload of commissioning personnel, while facilitating the documentations use, management and archive.