Advance Search
Volume 33 Issue 3
Mar.  2025
Turn off MathJax
Article Contents
ZHANG Xingzhong, DING Youyuan, XU Weizu, ZHU Xiaoyong, ZHOU Sheng. Examination and Adjustment of Piping Hangers before Commercial Operation in NPPs[J]. Nuclear Power Engineering, 2012, 33(3): 92-96.
Citation: ZHANG Xingzhong, DING Youyuan, XU Weizu, ZHU Xiaoyong, ZHOU Sheng. Examination and Adjustment of Piping Hangers before Commercial Operation in NPPs[J]. Nuclear Power Engineering, 2012, 33(3): 92-96.

Examination and Adjustment of Piping Hangers before Commercial Operation in NPPs

  • Received Date: 2011-03-02
  • Rev Recd Date: 2011-09-23
  • Available Online: 2025-03-08
  • This paper describes the basis,content and method of the cold and hot examination for the piping hangers during the plant commissioning,and explains the maintenance and regulation strategy of those abnormal hangers after inspection,and also expatiates the verification ways of piping hangers during hot condition before the plant is critical.Besides,this paper puts forward the notice items of piping hangers while installation,reconstruction and in-service inspection,and tries to make sure that the piping hangers are under normal working condition by the means of the inspection and regulation to the piping hangers,so that the system pipes can work safely and reliably.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (17) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return