Advance Search
Volume 41 Issue 4
Aug.  2020
Turn off MathJax
Article Contents
Xiao Kaihua, Shao Chunbing. Optimization of Pre-Service Inspection Scheme for CEPR CRDM[J]. Nuclear Power Engineering, 2020, 41(4): 178-180.
Citation: Xiao Kaihua, Shao Chunbing. Optimization of Pre-Service Inspection Scheme for CEPR CRDM[J]. Nuclear Power Engineering, 2020, 41(4): 178-180.

Optimization of Pre-Service Inspection Scheme for CEPR CRDM

  • Publish Date: 2020-08-15
  • After the installation of the pressure housing of the control rod drive mechanism (CRDM) in CEPR units, it was found that there were unqualified samples in the certificate test of CRDM welding. In order to shorten the period for the replacement of CRDM and reduce the impact on the overall progress of the project, a new pre-service inspection strategy is put forward by studying the pre-service inspection specifications in the process of the replacement of CRDM pressure housing. The practice shows that the off-line pre-service inspection of all CRDMs is completed within 10 days by using the optimized pre-service inspection scheme, which is about 20 days ahead of the original plan; through ultrasonic and eddy current inspection of some installed CRDMs, it is found that the results of off-line and on-line inspection are consistent, and there is no accessibility problem in on-line inspections.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (244) PDF downloads(1) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return