HOU Dong, LIN Meng, YANG Zongwei, LIU Pengfei, YANG Yanhua. Development and Application of Nuclear Power Plant DCS Closed-Loop Test Platform[J]. Nuclear Power Engineering, 2011, 32(4): 66-71.
Citation: HOU Dong, LIN Meng, YANG Zongwei, LIU Pengfei, YANG Yanhua. Development and Application of Nuclear Power Plant DCS Closed-Loop Test Platform[J]. Nuclear Power Engineering, 2011, 32(4): 66-71.

Development and Application of Nuclear Power Plant DCS Closed-Loop Test Platform

  • Received Date: 2010-02-24
    Available Online: 2025-03-08
  • A simulation platform with high flexibility and extensibility for nuclear power plant DCS closed-loop test has been developed.The system modeling for Ling’ao Phase II nuclear power plant has been built.Through an example of pressurizer pressure and water level control system testing under the condition of a 10%FP turbine power step-down,the way of using the platform for closed-loop DCS test and how to locate DCS problems were demonstrated.This test platform has been applied to DCS closed-loop test in Ling’ao Phase II successfully.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (19) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return