XIONG Guohua, QIN Yuxin, ZHANG Qiang, ZHANG Tao. Preventive Measures to Avoid Core Uncovering in Cold Shutdown for Pressurized Water Reactor Nuclear Power Plants[J]. Nuclear Power Engineering, 2012, 33(6): 96-100.
Citation:
|
XIONG Guohua, QIN Yuxin, ZHANG Qiang, ZHANG Tao. Preventive Measures to Avoid Core Uncovering in Cold Shutdown for Pressurized Water Reactor Nuclear Power Plants[J]. Nuclear Power Engineering, 2012, 33(6): 96-100.
|
XIONG Guohua, QIN Yuxin, ZHANG Qiang, ZHANG Tao. Preventive Measures to Avoid Core Uncovering in Cold Shutdown for Pressurized Water Reactor Nuclear Power Plants[J]. Nuclear Power Engineering, 2012, 33(6): 96-100.
Citation:
|
XIONG Guohua, QIN Yuxin, ZHANG Qiang, ZHANG Tao. Preventive Measures to Avoid Core Uncovering in Cold Shutdown for Pressurized Water Reactor Nuclear Power Plants[J]. Nuclear Power Engineering, 2012, 33(6): 96-100.
|
Preventive Measures to Avoid Core Uncovering in Cold Shutdown for Pressurized Water Reactor Nuclear Power Plants
-
1. China Nuclear Power Technology Research Institute, Shenzhen, Guandong, 518124, China;
-
2. Daya Bay Nuclear Power Operations and Management CO, Ltd, Shenzhen, Guangdong, 518124, China
- Received Date: 2011-07-29
- Rev Recd Date:
2011-12-15
Available Online:
2025-03-08