Yu Pei, Li Changyue. Steam Hammer Calculation and Analysis in Main Steam System of PWR Nuclear Power Plants[J]. Nuclear Power Engineering, 2014, 35(S1): 124-127.
Citation: Yu Pei, Li Changyue. Steam Hammer Calculation and Analysis in Main Steam System of PWR Nuclear Power Plants[J]. Nuclear Power Engineering, 2014, 35(S1): 124-127.

Steam Hammer Calculation and Analysis in Main Steam System of PWR Nuclear Power Plants

  • Received Date: 2013-11-26
  • Rev Recd Date: 2013-12-27
  • Available Online: 2025-02-15
  • Steam hammer pressure is solved though the simplified calculation.A mathematical model of main steam system in a million-kilowatt nuclear power plant is established using PIPENET software,and the model is from steam generator to main steam header.Steam hammer occurrence and reduction is simulated through transient calculating function.Parameters are calculated including maximum steam hammer pressure,maximum steam hammer load,the time of occurrence of the maximum steam hammer load and the position of occurrence of the maximum steam hammer load.The effect of straight pipe length and valve closing time on steam hammer is analyzed.The conclusion is that the shorter straight pipe is or the longer valve closing time is,the lower energy of steam hammer is.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (19) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return