Advance Search
Volume 35 Issue S1
Feb.  2025
Turn off MathJax
Article Contents
Liu Jianwei, Fan Sui. Analysis on System Commissioning Problems in Ling’ao II Nuclear Power Plant[J]. Nuclear Power Engineering, 2014, 35(S1): 40-43.
Citation: Liu Jianwei, Fan Sui. Analysis on System Commissioning Problems in Ling’ao II Nuclear Power Plant[J]. Nuclear Power Engineering, 2014, 35(S1): 40-43.

Analysis on System Commissioning Problems in Ling’ao II Nuclear Power Plant

  • Received Date: 2013-11-15
  • Rev Recd Date: 2014-01-24
  • Available Online: 2025-02-15
  • To resolve the plant field problems during the test and start-up,the problem cause shall be found out firstly.To make up the optimized method with the field environment,the relation of design,system operation and test method shall be clear.Some problems for plant test and start-up,such as the valve control problem of boron recycle system(REA),the signal block of residual heat removal system(RRA) and the pump false start-up of auxiliary feed water system(ASG) are stated.With deep understanding to the plant field environment and communicating with each one,the problem solutions are addressed in detail.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (34) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return