Advance Search
Volume 35 Issue S1
Feb.  2025
Turn off MathJax
Article Contents
Liang Bo, CHeN Liping, Wang Shuai. Comparison of Fire Protection Design at Pressurized Water Reactor Nuclear Power Plant[J]. Nuclear Power Engineering, 2014, 35(S1): 80-84.
Citation: Liang Bo, CHeN Liping, Wang Shuai. Comparison of Fire Protection Design at Pressurized Water Reactor Nuclear Power Plant[J]. Nuclear Power Engineering, 2014, 35(S1): 80-84.

Comparison of Fire Protection Design at Pressurized Water Reactor Nuclear Power Plant

  • Received Date: 2013-12-18
  • Rev Recd Date: 2014-02-25
  • Available Online: 2025-02-15
  • The fire protection design of the 3rd generation passive pressurized nuclear power plant(AP1000 for short) in U.S.and the 3rd generation innovation pressurized nuclear power plant(EPR for short) in France and the 2nd plus generation pressurized nuclear power plant(CPR1000 for short) in China are introduced and compared.In respect of the purpose and principle of fire protection,fire prevention,fire detection and alarm,the smoke control of these three PWRs are basically the same.Due to the passive design,AP1000 fire water supply system is designed on the basis of "Different Solutions for Different Cases,Critical Defenses for Critical Places",comparing with the other two types,with more complexity in the classification of FPS,increasing the functions and diversification of the system and decreasing the fire load.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (27) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return