Advance Search
Volume 35 Issue S1
Feb.  2025
Turn off MathJax
Article Contents
Zhang Liqin, Qiu Jianwen, Wang Jiangbo. Nuclear Safety Valve Components Analysis and Implementation of Seismic Qualification Test[J]. Nuclear Power Engineering, 2014, 35(S1): 133-135.
Citation: Zhang Liqin, Qiu Jianwen, Wang Jiangbo. Nuclear Safety Valve Components Analysis and Implementation of Seismic Qualification Test[J]. Nuclear Power Engineering, 2014, 35(S1): 133-135.

Nuclear Safety Valve Components Analysis and Implementation of Seismic Qualification Test

  • Received Date: 2013-12-16
  • Rev Recd Date: 2014-02-26
  • Available Online: 2025-02-15
  • A series of safety-classified qualification tests are carried out on nuclear safety level K2,K3 class solenoid valve and limit switch developed by domestic manufacturers.Test condition and test requirements for anti-seismic experiments on the equipment to be qualified are introduced,and the universal device spectrum is selected for the anti-earthquake test based on the actual situation of the equipment to be qualified.In order to ensure the safety and reliability of the equipment operation during the earthquake,the load circuit of solenoid valve and the contact bounce monitoring devices of limit switch are developed,and operation test is conducted on the solenoid valve and the switch contacts chatter during the seismic tests is monitored.Test conditions and results fully meet the requirements.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (24) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return