Advance Search
Volume 32 Issue S2
Mar.  2025
Turn off MathJax
Article Contents
SONG Yuan-qi, ZHOU Xiang-qun, WU Jian-jun, FU Yu. Selection and Design of Spring Foundation of Half Speed Turbine Generator for Ling’ao Phase Ⅱ NPP[J]. Nuclear Power Engineering, 2011, 32(S2): 34-37.
Citation: SONG Yuan-qi, ZHOU Xiang-qun, WU Jian-jun, FU Yu. Selection and Design of Spring Foundation of Half Speed Turbine Generator for Ling’ao Phase Ⅱ NPP[J]. Nuclear Power Engineering, 2011, 32(S2): 34-37.

Selection and Design of Spring Foundation of Half Speed Turbine Generator for Ling’ao Phase Ⅱ NPP

  • Received Date: 2011-09-07
  • Rev Recd Date: 2011-11-15
  • Available Online: 2025-03-08
  • Half-speed steam turbine generator for Ling’ao phase II nuclear power plant uses the spring vibration isolation foundation at first.From the type selection,design standards and vibration analysis and comparison with the measured data,the design process of spring foundation is elaborated.Exerting fully the advantages of the spring foundation,such as "low frequency",the earthquake-resistance and the adjustability,the safe operation of the half-speed steam turbine unit is ensured.

     

  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Article Metrics

    Article views (15) PDF downloads(0) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return