The control solution of HAINAN nuclear project’s RCP is changed compared with the reference plant,thus the RCP shaft seal water flow measurement is influenced,and the relevant I&C design of Chemical and Volume Control System(RCV) has to be changed.A detailed analysis of several measure solution and related problems is expatiated here,and a feasible solution has been found to solve the problems,to make sure the system function is performed safely.