Revision of Emergency Operation Procedure and Site Emergency Plan on Implementation of SAMG in Daya Bay Nuclear Power Station
-
摘要: 根据大亚湾核电站严重事故管理导则实施过程中的程序接口,介绍了大亚湾核电站应急运行规程接口的确定办法及核电站应急计划的修改内容。Abstract: The report describes the definition of interface between EOP and Severe accident management guidance in GNPS,and also introduces the revised content of GNPS Site Emergency Plan in the implementation of SAMG.
-