Control Measures for Prevention of Mass Concrete Cracks in Construction of Chashma Nuclear Power Project Unit 2
-
摘要: 大体积砼施工是核电站土建施工技术的关键,必须对其可能产生的裂缝进行有效的控制。本文阐述了恰希玛核电站二期工程大体积砼裂缝控制的主要措施以及取得的效果,为类似的核电站工程提供借鉴。Abstract: The pour of mass concrete,which requires an effective control of possible cracks,is a key technical element in the civil construction of nuclear power plants.This paper offers a detailed description of the main measures and the effectiveness for the control of mass concrete cracks of Chashma Nuclear Power Plant Unit 2.
-
Key words:
- Chashma nuclear power plant /
- Mass concrete /
- Cracks /
- Control measures
-