Design of Inadequate Core Cooling Monitoring System in Qinshan Phase II Extension Project
-
摘要: 由于秦山核电二期工程中使用的堆芯冷却监测系统机柜已停产,所以在秦山二期扩建工程中采用了安全级数字化仪表控制系统(TXS)作为堆芯冷却监测系统的处理平台。本文详细描述了采用TXS平台后堆芯冷却监测系统的结构和工作原理。Abstract: Since the equipment of Inadequate Core Cooling Monitoring System (ICCMS) applied in Qinshan phase II project has not been produced any longer,TXS will be applied in ICCMS as an alternative choice in Qinshan phase II extension project.This paper gives a generally description of the structure and theory of ICCMS in the extension project.
-
计量
- 文章访问数: 8
- HTML全文浏览量: 2
- PDF下载量: 0
- 被引次数: 0