Abstract:
This paper introduces the function,the process flow and the classification of the facilities of conveyance system for China Advanced Research Reactor(CARR).Also it structurally describes the important facilities such as fuel handling machine,double station handling tool,bevel pipe alleyway and spent fuel dry storage facility.The fuel handling machine,one of the important facilities of this system,has past the ex-factory test,which indicates that it can meet the function requirements and its design is proper.